GMR Hyderabad Fulfillment Center has received a Final EDGE Advanced Certification from Sintali.

GMR Hyderabad Fulfillment Center

GMR Hyderabad Fulfillment Center


GMR Fulfillment Center, a part of GMR Group in Hyderabad, is a warehouse development located adjacent to Rajiv Gandhi International Airport in Shamshabad, Telangana, India. The project consists of a total area of 94,574.6 square meters out of which 51,154 square meters are designated as retail space.

As part of GMR Group’s sustainable buildings initiative and its commitment for a sustainable tomorrow, the GMR Fulfillment Center was designed and built as an example of resource efficiency in the retail sector.

Energy-efficient HVAC systems with LED lighting for internal and external spaces and insulation for the roof reduce the building’s energy use, while water-efficient plumbing and a black water treatment and recycling system were installed to reduce the warehouse’s water use. Additionally, a solar photovoltaics system covering 60.5% of the facility’s annual electricity use was installed, providing further energy savings and reducing the warehouse’s dependency on the grid.

Through the use of state-of-the-art construction materials such as AAC (Autoclaved Aerated Concrete Blocks) for internal and external walls, concrete and timber for flooring and slabs, steel sheets on steel rafters and steel profile cladding for external walls the project was further able to achieve a substantial reduction in the energy embodied in materials, resulting in a lower carbon footprint and a more sustainable building design.

GMR Hyderabad Fulfillment Center has received Final EDGE Advanced certification from SINTALI.

Predicted Savings of EDGE Certification



77%

Energy Savings*


84%

Water Savings


70%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window to wall ratio, insulation of the roof, energy efficient HVAC systems along with VSDs (variable speed drives) for AHUs (air handling units), LED lighting for internal and external spaces, and solar photovoltaics.


Water


Aerators and auto shut-off faucets, dual flush water closets, water-less urinals and a black water treatment and recycling system for toilet flushing and landscaping requirements.


Materials


Timber for floor slabs, steel (zinc or galvanized iron) sheets on steel rafters for the roof, AAC blocks for external and internal walls, steel profile cladding for external walls and finished concrete flooring.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


At Landside, Rajiv Gandhi International Airport

Shamshabad, Hyderabad, Telangana, India

More Information:


Stage:


Final EDGE Advanced Certification

Date:


September 2021

Floor Space:


51,154 m2

Total CO2 Savings:


790.16 tCO2/Year

Massmart Distribution Centre has received a Preliminary EDGE Advanced Certificate from Green Business Certification Inc. (GBCI).

Massmart Distribution Centre

Massmart Distribution Centre


The Massmart Distribution Centre is a 54.000 square meter logistics hub located in Durban North, a suburban part of Durban, KwaZulu-Natal, South Africa. The project has a mixed purpose, consisting mostly of warehouse space with a section to be used as office space for Massmart, a South African retail company and subsidiary of the American Walmart chain. Massmart Distribution Centre was developed by JT Ross Property Group, a local property developer with a focus on developing large-scale commercial and logistics projects for national and international corporate clients.

To meet international standards for resource efficiency, energy and water-saving technologies were incorporated into the design, construction and internal processes of the building. Reflective paint, low-E coated glass, LED lighting and a solar photovoltaics system covering 34% of projected electricity consumption reduce the distribution centre’s energy use, while water-efficient plumbing fixtures reduce its water use. Altogether these savings will not just help lowering operational expenses but also yield a more sustainable project overall with a significant reduction in its carbon footprint.

Massmart Distribution Centre has received a Preliminary EDGE Advanced Certificate from Green Business Certification Inc. (GBCI).

Predicted Savings of EDGE Certification



42%

Energy Savings*


27%

Water Savings


44%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window to wall ratio, reflective paint/tiles and insulation for the roof, insulation of external walls, low-E coated glass, variable refrigerant flow (VRF) cooling system, energy-saving lighting in sales, corridors, common and external areas, and solar photovoltaics covering 34% of total electricity consumption.


Water


Aerators/auto shut-off faucets, water-efficient faucets for kitchen sinks, water-efficient urinals and dual flush for water closets.


Materials


In-situ reinforced concrete slab for floor construction, steel sheets on steel rafters for the roof, steel profile cladding and precast concrete panels for external walls, common brick with plaster on both sides for internal walls, finished concrete floors and aluminum window frames.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Massmart Distribution Centre, JT Ross Park
Northfield
90 Old Northcoast Road
Durban North
Durban, Kwa Zulu Natal

South Africa

More Information:


Stage:


Preliminary EDGE Advanced Certificate

Date:


December 2021

Floor Space:


54,665 m2

Total CO2 Savings:


3,699.04 tCO2/Year

Equites Park Lords View has received Final EDGE Advanced certification from Green Business Certification Inc. (GBCI).

Equites Park Lords View – Premier Foods

Equites Park Lords View – Premier Foods


Premier Foods, a leading fast-moving consumer goods (FMCG) company in South Africa, has opened a new facility at Equites Property Funds’ Lords View industrial park. Situated on Allandale Road, with access to both Pretoria and M39, Lords View can accommodate development opportunities ranging from 5,000 to 45,000 square meters.

Resource-efficient design and technologies were incorporated into the warehouse for Premier Foods to conserve natural resources. LED lighting and solar photovoltaics were installed to reduce the warehouse’s energy use, while dual-flush water closets and water-efficient faucets were installed to reduce the warehouse’s water use. The resource efficiency of the warehouse is a manifestation of Premier Foods’ commitment to reduce the environmental impacts of its infrastructure.

Equites Property Fund, the developer of the industrial park, is committed to incorporating sustainable practices into its developments. This commitment extends beyond its developments’ buildings. At Lords View, parking is available for fuel-efficient vehicles and special provisions are available for cyclists.

Equites Park Lords View – Premier Foods has received Final EDGE Advanced certification from Green Business Certification Inc. (GBCI).

Predicted Savings of EDGE Certification



52%

Energy Savings*


32%

Water Savings


51%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, solar photovoltaics covering over 52% of total electricity use, occupancy sensors in bathrooms and energy-saving lighting in the external, sales, corridors and common areas.


Water


Dual-flush water closets, aerators for faucets and water-efficient urinals, water-efficient faucets for kitchen sinks.


Materials


In-situ reinforced concrete for floor construction, steel sheets on steel rafters for the roof,  steel profile cladding and precast concrete panels for external walls, common brick wall with plaster on both sides for internal walls, finished concrete floor and ceramic tile for flooring and aluminum window frames.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Lords View Industrial Park, 4 Jacardanda Street, Chloorkop Ext. 66
Midrand, Johannesburg, Gauteng, South Africa

More Information:


Stage:


Final EDGE Advanced Certification

Date:


June 2020

Floor Space:


11,367 m2

Total CO2 Savings:


440.99 tCO2/Year

Equites Philippi Spec has received Final EDGE Advanced Certification from Green Business Certification Inc. (GBCI).

Equites Philippi Spec

Equites Philippi Spec


Equites Property Fund has constructed a new modern logistics space in Philippi, Cape Town. The space includes a 7,711 square meter warehouse and 361 square meter office building.

Equites Property Fund, the developer of the industrial park, is committed to incorporating sustainable practices into its developments. Equites Property Fund has also EDGE-certified warehouses at its Lords View and Meadowview developments. Ecolution also performed EDGE Expert and EDGE Auditor services for this project.

Through the use of state-of-the-art construction technologies such as reflective painting of the roof, a variable refrigerant (VRV) cooling system, energy-saving LED lightbulbs, solar photovoltaics covering 46% of the building’s electricity consumption, and water-efficient plumbing features, the project was able to significantly reduce its energy and water consumption, as well as energy embodied in materials, resulting in a more sustainable construction project and a reduced carbon footprint.

Equites Philippi Spec has received Final EDGE Advanced Certification from Green Business Certification Inc. (GBCI).

Predicted Savings of EDGE Certification



42%

Energy Savings*


34%

Water Savings


55%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window to wall ratio, reflective paint/tiles for the roof, variable refrigerant (VRV) cooling sysstems, energy-saving lighting in sales, corridors, common and external areas, and solar photovoltaics to provide 45.68% of annual energy use.


Water


Efficient-flush water closets, water-efficient urinals and faucets for kitchen sinks, and aerators/auto shut-off faucets.


Materials


In-situ reinforced concrete slab for floor, steel sheets on steel rafters for roof construction, steel profile cladding for external walls, finished concrete floor for flooring, and aluminum window frames.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Philippi Spec
ERF 176382, Lansdowne Road
Philippi, Cape Town, Western Cape, South Africa

More Information:


Stage:


Final EDGE Advanced Certificate

Date:


October 2021

Floor Space:


8,433.25 m2

Total CO2 Savings:


617.56 tCO2/Year

CEDIS 7 La Encantada

CEDIS 7 La Encantada


CEDIS 7 La Encantada is a warehouse located in the city of Gomez Palacio in the state of Durango. Developed by GINN and constructed by Trebotti, the project was designed to reduce its environmental impact by incorporating resource-efficient measures, including LED lighting and low-flow plumbing fixtures.

La Encantada has received final EDGE certification from GBCI.

Predicted Savings of EDGE Certification



32%

Energy Savings*


50%

Water Savings


50%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, insulation and reflective paint/tiles for the roof, air conditioning with an air cooled screw chiller, energy saving lighting in sales, common, and corridor areas, and skylights that provide daylight to 50 percent of the top floor area.


Water


Efficient flush water closets, water-efficient urinals, and aerators/auto shut-off faucets.


Materials


Composite in-situ reinforced concrete and steel deck for the floor, aluminum sheets on steel rafters for the roof, medium weight hollow concrete blocks and plasterboards on metal studs for the internal walls, in-situ reinforced external walls, and ceramic tile and finished concrete flooring.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Calle Manuel Rodriguez Castillo #2000, Parque Industrial La Encantada
Gomez Palacio, Durango, Mexico

More Information:


Stage:


Final EDGE Certification

Date:


April 2021

Floor Space:


11,912 m2

Total CO2 Savings:


70.1 tCO2/Year

Indospace Rohan Industrial Park Khed has received Final EDGE Certification from GBCI.

Indospace Rohan Industrial Park Kehd Pvt. Ltd.

Indospace Rohan Industrial Park Kehd Pvt.Ltd.


IndoSpace Rohan Industrial Park Khed is located in the Chakan industrial area of Pune, a prime industrial area where the manufacturing facilities of many large corporations are based. The park features energy-saving measures including skylights for natural daylight, a wastewater treatment and rainwater harvesting system, and energy-efficient electrical equipment, among others.

The park has been developed by IndoSpace, a company committed to building industrial spaces that allow tenants to maximize profit with minimal harm to the environment.

IndoSpace Rohan Industrial Park Khed has received EDGE Advanced certification from GBCI.

Predicted Savings of EDGE Certification



42%

Energy Savings*


55%

Water Savings


61%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, energy-saving lighting in the sales area, and skylights to provide daylight to 50 percent of the top floor area.


Water


Efficient-flush water closets, water-efficient urinals in all bathrooms, aerators for faucets/auto shut-off faucets, and a grey water treatment and recycling system.


Materials


In-situ reinforced concrete slab for the floor, steel sheets on steel rafters for the roof construction, steel profile cladding for external walls, common brick walls with internal and external plaster for external walls, and finished concrete flooring.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Gat No. 339, 341, Tal, Mahalungelngale
Pune, Mahrashtra, India

More Information:


Stage:


Final EDGE Certification

Date:


March 2021

Floor Space:


126,462 m2

Total CO2 Savings:


1,842.3 tCO2/Year

Metro Myanmar

Metro Myanmar


Metro Myanmar, a warehouse in the Thilawa Special Economic Zone outside Yangon, offers food service distribution for hotels, restaurants, catering firms, and independent small retailers.

Aligned with METRO Wholesale Myanmar’s commitment to lowering its environmental impact, the warehouse utilizes resource-efficient design features and technologies. An energy-efficient air conditioning system, insulation, LED lighting, and low-flow plumbing fixtures are used to reduce the building’s energy and water use.

As the first EDGE-certified building in Myanmar, the warehouse allows METRO Wholesale Myanmar to take a leading position in promoting green building standards in the country.

Metro Myanmar has received final EDGE certification from thinkstep-SGS.

Predicted Savings of EDGE Certification



34%

Energy Savings*


37%

Water Savings


66%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, insulation of the roof and external walls, a variable refrigerant volume (VRV) cooling system, and energy-saving lighting in the sales area.


Water


Dual-flush water closets and water-efficient urinals.


Materials


In-situ reinforced concrete slab for the floor, steel sheets on steel rafters for the roof, plasterboards on metal studs with insulation for the internal walls, and steel-clad sandwich panel for the external walls.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


Lot No. B-8, Zone A, Thilawa Special Economic Zone
Thanlyin Township, Yangon, Myanmar

More Information:


Stage:


Final EDGE Certification

Date:


May 2020

Floor Space:


7,764 m2

Total CO2 Savings:


142.7 tCO2/Year

LatAm Parque Logístico Coyol I – Warehouse 500

LatAm Parque Logístico Coyol I – Warehouse 500


LatAm Parque Logístico Coyol I is a 19-hectares logistics park located on the Coyol-Alajuela highway in Costa Rica. The park’s five warehouses provide customers with 80,000 square meters of Class A logistics facilities.

Resource-efficient design and technologies were incorporated into Warehouse 500 to reduce its environmental impact. Reflective paint, energy-saving lighting, and occupancy sensors were used to reduce the building’s energy use, while water-efficient plumbing fixtures were installed to reduce the building’s water use.

The developer, LatAm Logístico Properties (LLP), is committed to the development and operation of modern, resource-efficient logistics parks. They develop, acquire, and operate state-of-the-art, Class-A warehouses in Peru, Colombia, and Costa Rica. Leveraging its team throughout the region, the company provides local expertise in market dynamics, site selection, and regulatory approvals. LatAm Logístico Properties (LLP) has also certified its Lima Sur property in Peru.

LatAm Parque Logístico  Coyol I – Warehouse 500 has received EDGE Advanced certification from Sintali-SGS.

Predicted Savings of EDGE Certification



44%

Energy Savings*


31%

Water Savings


78%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window to wall ratio, reflective paint/tiles for the roof and external walls, energy-saving lighting in the sales and external areas, and occupancy sensors in bathrooms.


Water


Aerators and auto shut-off faucets and water-efficient single-flush water closets and urinals.


Materials


In-situ reinforced concrete for the floor, steel-clad sandwich panel for the roof, plasterboards on metal stuffs with insulation for internal walls, and medium weight hollow concrete blocks and steel-clad sandwich panels for external walls.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


LatAm Coyol I Bodega 500
Coyol, Alajuela, Costa Rica

More Information:


Stage:


Final EDGE Certification

Date:


September 2020

Floor Space:


9,243 m2

Total CO2 Savings:


31.8 tCO2/Year

Equites Park Meadowview – Digistics

Equites Park Meadowview – Digistics


Digistics, a leading supply chain group in South Africa, is opening a new facility at Equites Property Fund’s Meadowview industrial park. Situated next to the N3 highway in Johannesburg, Meadowview can accommodate development opportunities ranging from 5,000 to 20,000 square meters.

Resource-efficient design and technologies will be incorporated into the Digistics’ warehouse to reduce its environmental impact. LED lighting, reflective paint, and solar photovoltaics will be installed to reduce the warehouse’s energy use, while auto shut-off faucets and water-efficient plumbing fixtures will be installed to reduce the warehouse’s water use. The resource efficiency of the warehouse is a manifestation of Digistics’ commitment to lower the carbon footprint of its operations.

Equites Property Fund, the developer of the industrial park, is committed to incorporating sustainable practices into its developments. Equites Property Fund has also EDGE-certified the Altron warehouse at Meadowview and the Premier Foods warehouse at its Lords View development.

Equites Park Meadowview – Digistics has received a preliminary EDGE certificate from GBCI.

Predicted Savings of EDGE Certification



31%

Energy Savings*


48%

Water Savings


56%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, reflective paint/tiles for the roof, low-E coated glass, solar photovoltaics, and energy-saving lighting in sales, corridors, common, and external areas.


Water


Aerators and auto shut-off faucets and water-efficient flush water closets and urinals.


Materials


Concrete filler slab for the floor, steel sheets on steel rafters for the roof, precast concrete panels and steel profiles cladding for external walls, and finished concrete flooring.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


ERF 191, Linbro Park Ext. 190, Ronald Avenue
Johannesburg, Gauteng, South Africa

More Information:


Stage:


Preliminary EDGE Certificate

Date:


August 2020

Floor Space:


20,475 m2

Total CO2 Savings:


1,670.0 tCO2/Year

Equites Park Meadowview – Altron

Equites Park Meadowview – Altron


Altron, a leading information and technology (ICT) company in South Africa, has opened a new facility at Equites Property Fund’s Meadowview industrial park. Situated next to the N3 highway in Johannesburg, Meadowview can accommodate development opportunities ranging from 5,000 to 20,000 square meters.

Resource-efficient design and technologies were incorporated into the warehouse for Altron to conserve natural resources. LED lighting and solar photovoltaics were installed to reduce the warehouse’s energy use, while dual-flush water closets and water-efficient faucets were installed to reduce the warehouse’s water use. The resource efficiency of the warehouse is a manifestation of Altron’s commitment to reduce the environmental impacts of its infrastructure.

Equites Property Fund, the developer of the industrial park, is committed to incorporating sustainable practices into its developments. Equites Property Fund has also EDGE-certified two warehouses at its Lords View development. Ecolution also performed EDGE Expert and EDGE Auditor services for this project.

Equites Park Meadowview – Altron has received final EDGE certification from GBCI.

Predicted Savings of EDGE Certification



39%

Energy Savings*


21%

Water Savings


55%

Less Embodied Energy in Materials

Technical Solutions


Energy


Reduced window-to-wall ratio, low e-coated glass, a variable refrigerant volume (VRV) cooling system, solar photovoltaics, and energy-saving lighting in the sales, common, and corridor areas.


Water


Water-efficient water closets, urinals, and faucets for kitchen sinks.


Materials


In-situ reinforced concrete slab for the floor, steel sheets on steel rafters for the roof, and precast concrete panels and steel profile cladding for external walls.


*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Location:


ERF 191, Linbro Park Ext. 190, Ronald Avenue
Johannesburg, Gauteng, South Africa

More Information:


Stage:


Final EDGE Certification

Date:


March 2021

Floor Space:


24,479 m2

Total CO2 Savings:


1,163.9 tCO2/Year