The CEDI Barranquilla distribution center is located on the Troncal del Caribe, in the municipality of Galapa in Atlántico, 18 km from the city of Barranquilla.

This project is currently under construction, with an area of 19,700 square meters of construction on a lot of 40,000 square meters. It features facilities for warehouse and storage logistics, EDGE certification in design and construction, a wastewater treatment system, high-performance materials used for facade and roof construction, translucent tiles for natural lighting 3combined with LED bulbs, and water-saving plumbing and water management systems.

Its design allows for thermal comfort inside the project, achieving a significant reduction in water and energy consumption thanks to the efficiency strategies applied to it.

CEDI Distribution Center Barranquilla has achieved a Preliminary EDGE Advanced Certificate from CAMACOL.

Predicted Savings of EDGE Certification

0%

Energy Savings*

0%

Water Savings

0%

Less Embodied Energy in Materials

*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Technical Solutions

Energy

Reduced Window to Wall Ratio, Reflective Paint/Tiles for Roof, Reflective Paint for External Walls, Insulation of Roof, Insulation of External Walls, Energy Saving Light Bulbs- Sales Area
Energy Saving Light Bulbs- Corridors and Common Areas, Energy Saving Light Bulbs- External Areas, Skylight(s) to Provide Daylight to 50% of Top Floor Area

Water

Efficient Flush for Water Closets in All Bathrooms, Water-Efficient Urinals in all Bathrooms, Aerators for Faucets/ Auto Shut-Off Faucet, Water-Efficient Faucets for Kitchen Sinks

Materials

Floor Slabs – In-Situ Trough Concrete Slab, Roof Construction – Steel-Clad Sandwich Panel, External Walls – Medium Weight Hollow Concrete Blocks, External Walls – Aluminum-Clad Sandwich Panel, Internal Walls – Medium Weight Hollow Concrete Blocks, Internal Walls – Plasterboards on Metal Studs, Flooring – Finished Concrete Floor

Location

CEDI Barranquilla LOTE SAN JOSE 1A-4-2D-2 Galapa, Colombia

Stage

Preliminary EDGE Advanced Certification

Date

November 1, 2021

Floor Space (m2)

19,773

Total CO2 Savings (annually)

99.83