Earlbeam One Place
Earlbeam Company Limited is focused on making our buildings more resource-efficient and therefore have put together a strategic plan to get most of their new developments and existing buildings to sign up for Green Building Certification. Knowing the great short- and long-term benefits to be attained from having green buildings, they have made it a priority in ensuring that design and construction inputs and processes are meticulously managed to achieve this target.
One Place by Radisson Hotel Group is one of the company’s Projects currently going through the process of Edge Certification.
One Place by Radisson Accra offers opportunities to capitalise on a proven market, and because the property is operated by a renowned hospitality group, investors can enjoy optimum convenience and peace of mind that their investment is in safe hands.
It is a Mix-Use Facility set to become one of the most desirable destinations for hotel residences, office space, sky bar, restaurant & Café, retail spaces, as well as gym & spa in Accra. The penthouse level has been positioned in the topmost floors to give our clients an exclusive view of the city and the beauty of the Achimota Forest Reserve for their relaxation.
The location of the project is in close proximity to several businesses in the oil and gas, banking and finance, manufacturing and hospitality sectors, as well as government agencies including Tullow Oil Ghana, Ghana Petroleum Commission, National Petroleum Authority, Ghana Gas, Kosmos Energy, the Africa Regent and Fiesta Royal Hotels.
Within a three-kilometer radius of the project site is the Kotoka International Airport, Accra Mall (retail and entertainment) and the Airport City Complex.
Earlbeam One Place has received a Preliminary EDGE Certificate from Sintali-SGS.
Technical Solutions
Energy
Reflective Paint/Tiles for Roof, Insulation of Roof, Insulation of External Wall, Efficient Glass, Energy-Efficient Lighting for Internal Areas
Water
Low Flow Showerheads, Low-Flow Faucets for Private Bathrooms, Low-Flow Faucets for Public Bathrooms, Low-Flow Water Closets for Private Bathrooms, Low-Flow Water Closets for Public Bathrooms, Water Efficient Bidet, Low Flow Urinals, Low-Flow Faucets for Kitchen Sink, Water-Efficient Dishwashers, Low-Flow Pre Rinse Spray Valve for Kitchen, Rainwater Harvesting System
Materials
Bottom Floor Construction – X – Re-use of Existing Floor slab, Intermediate Floor Construction – Concrete Slab | In-situ Reinforced Conventional
Slab, Floor Finish – Concrete | Finished Floor, Exterior Walls – Concrete In-Situ | Reinforced Concrete Wall, Exterior Walls – Concrete Blocks | Hollow Blocks of Medium-Weight, Interior Walls – Concrete In-Situ | Reinforced Concrete Wall, Interior Walls – Concrete Blocks | Hollow Blocks of Medium-weight
Location
Earlbeam One Place No.6 GEORGE WALKER BUSH HIGHWAY Accra Ghana
Stage
Preliminary EDGE Certification
Date
April 1, 2022
Floor Space (m2)
32,504
Total CO2 Savings (annually)
278.41
Client Details
https://www.facebook.com/earlbeamrealty/
https://gh.linkedin.com/company/earlbeamrealty
Certified By
Sintali-SGS