Springhill LIMA

Springhill LIMA

EDGE Advanced

The Springhill LIMA Standard Factory Building is being developed by Springhill Holdings. It is located in the LIMA Technology Park in Batangas, Philippines, an industrial park that caters to a multitude of export-oriented manufacturing companies. The facility is built to serve any industry’s manufacturing processes or warehousing with high vertical racking systems.

The facility utilizes radiant and vapor-barrier insulation on all covered areas, which drastically cools the buildings and mitigates the energy needs of cooling systems amid the tropical heat and humidity. The use of skylights and energy-saving LED lighting further reduces electricity consumption for the facility. Water-efficient plumbing features also allow for a reduced consumption of water. In combination with construction materials that allowed for a reduction of energy embodied in materials of over 73%, this resulted in a more sustainable construction project overall and a reduced carbon footprint. The facility’s roof was designed to allow for the installation of multiple solar panels. Structurally, the buildings are set to withstand typhoon force winds.

Springhill LIMA has received a Preliminary EDGE Certificate from the Philippine Green Building Initiative (PGBI).

Predicted Savings of EDGE Certification

0%

Energy Savings*

0%

Water Savings

0%

Less Embodied Energy in Materials

*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Technical Solutions

Energy

Reduced window to wall ratio, reflective paint and insulation for the roof, energy-saving lighting in sales, corridors, common and external areas, and skylights to provide daylight to 50 percent of the top floor’s area.

Water

Efficient flush for all water closets, and water-efficient urinals in all bathrooms.

Materials

In-situ reinforced concrete slab for the floor, steel sheets on steel rafters for the roof, medium weight hollow concrete blocks for internal and external walls, finished concrete floor and aluminum window frames.

Location

Springhill LIMA Lot 2G Block 7A, Phase 3, LIMA Technology Center Malvar, Batangas 4233 Philippines

Stage

Preliminary EDGE Advanced Certificate

Date

February 1, 2022

Floor Space (m2)

14,683.4

Total CO2 Savings (annually)

141.23