Urbanización Piamonte – Plan Maestro Cittavento

Urbanización Piamonte – Plan Maestro Cittavento

EDGE Advanced

Piamonte is the first stage of the Cittavento Master Plan, located in the north of Guayaquil, Ecuador. The project offers 422 efficient and sustainable homes with 6 models available and a large number of amenities integrated with green areas and walkways that make this development a good place to live. It favors family savings through the implementation of efficiency strategies in the different designs, both in the urbanism and in the houses, using LED lighting, automatic control system, home automation, solar panels, low consumption faucets and toilets, irrigation system for common green areas using treated water.

Furoiani Obras y Proyectos is a reference name in real estate and urban development with more than 58 years of experience as a builder of products, projects and dreams, with the highest standards of excellence. This ensures excellent results and guarantees a comprehensive sustainable development, offering a source of quality of life, through environmentally friendly construction.

Urbanización Piamonte – Plan Maestro Cittavento has received a Preliminary EDGE Advanced Certificate from Sintali.

Predicted Savings of EDGE Certification

0%

Energy Savings*

0%

Water Savings

0%

Less Embodied Energy in Materials

*Part of the energy efficiency percentage may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Note that virtual energy does not contribute savings to utility bills.

Technical Solutions

Energy

Reduced Window to Wall Ratio, Reflective Paint/Tiles for Roof, Reflective Paint for External Walls, Energy-Saving Light Bulbs – Internal Spaces, Energy-Saving Light Bulbs – External Spaces, Lighting Controls for Corridors and Staircases, Solar Photovoltaics

Water

Low-Flow Showerheads, Low-Flow Faucets for Kitchen Sinks, Low-Flow Faucets for Washbasins, Dual Flush for Water Closets

Materials

Floor Slabs – In-Situ Reinforced Concrete Slab, Roof Construction – Micro Concrete Tiles on Steel Rafters, External Walls – In-Situ Reinforced Wall, Internal Walls – In-Situ Reinforced Wall

Location

Cittavento, Vial 1 y Vial 4A, km 13.5 vía salitre Daule 091901, Ecuador

Stage

Preliminary EDGE Advanced Certificate

Date

March 1, 2022

Floor Space (m2)

37,004.26

Total CO2 Savings (annually)

391.27

Certified By

Sintali-SGS

Interested in learning
more about EDGE?

Sign-Up for our Mailing Lists

Still thinking?